Utility Pole Seismic Reinforcement Mortar Leakage Prevention TD Stopper
Prevention of mortar leakage from steel pipe units. Mortar filling can be done immediately after the installation of the steel pipe unit.
By installing a concave sponge-like material at the bottom of the steel pipe unit, it is possible to fill it without leaking non-shrink mortar immediately after installation. 【Usage Precautions】Handling Notes 1. Please use this product within 6 months after delivery. 2. When installing this product, ensure there is no twisting, distortion, or detachment (it is recommended to correct any unevenness at the base beforehand). 3. Any excess length that occurs while this product is attached to the steel pipe unit should be cut off with a cutter or similar tool (it is recommended to cut at the connection side towards the track). 4. During the period from mortar placement to curing, secure the top of the steel pipe unit with a TD spacer or similar (to prevent mortar leakage). 5. After the mortar in the steel pipe unit has cured, remove any parts that protrude from the steel pipe unit within reach using a cutter or similar tool (leave any parts that remain inside the steel pipe unit).
- Company:FCR
- Price:Other